• Project: Reid Reserve, Gawler

    Client: Town of Gawler

  • Project: Chippendale Pump Station

    Client: City of West Torrens

  • Project: Kerb and Gutter Replacement Programme

    Client: City of West Torrens

  • Project: Old Coach Road, Maslin Beach

    Client: City of Onkaparinga

  • Project: Dam Construction

    Client: Trinity College – Gawler

  • Project: Kent Civil Pilatus Drive Office

    Client: Kent Civil

  • Project: St Clair Recreation Precinct

    Client: City of Charles Sturt

Kent Civil Pty Ltd - Project Experience

Listed below are some of our previous projects with a brief description:

Project Name:

Client:

Value:

Description:

St Clair Recreation Precinct Woodville

City of Charles Sturt

$1,800,000.00

construction of two new carparks, a new roadway, tennis courts, futsal court and a new shared path linking the recreation centre to the new Courts and Playground.
Relocation of intermediate contaminated soils on site with a triaxle barrier placed on top.


 

Project Name:

Client:

Value:

Description:

Waymouth Street East – Streetscape Works

City of Adelaide

$1,300,000.00

Streetscape upgrade and widening of Waymouth Street, between Topham Mall and Waymouth Place.
Works included: demolition and removal of existing paved footpaths, kerbing, pram ramps and asphalt, construction of 150mm thick structural concrete slab, installation of new stratacell matrix cell landscaping and stormwater drainage, installation of new lighting, construction of mortar bedding and jointed large format paving, adjustment and new surrounds to service pits, installation of new trees and tree grilles.


 

Project Name:

Client:

Value:

Description:

Old Coach Road, Maslin Beach

City of Onkaparinga

$2,900,000.00

Road reconstruction – profiling deep lift & asphalt.
Associated stormwater works.
Shared path construction.
Kerbing and gutter.
New electrical infrastructure.
Preparation work for future landscaping.


 

Project Name:

Client:

Value:

Description:

Diment Road, Drainage & Road Upgrade

City of Salisbury

$580,000.00

Earthwork Drainage swales.
Box culvert installation
Stormwater and associated infrastructure
Road pavement construction


 

Project Name:

Client:

Value:

Description:

Waymouth Street, Adelaide

Adelaide City Council

$385,000.00

Sawcut and demolish existing asphalt, kerbing, signs etc. as required.
Supply and install new kerbing and protuberances.
Supply, install rain garden filter media and plants
Re-instate asphalt.
Supply, install new permeable paving.
Re-line mark as per drawings to suit new conditions.
Install new stormwater hook-ups.


 

Project Name:

Client:

Value:

Description:

Reid Reserve, Gawler

Town of Gawler

$730,000.00

Design and construct new pedestrian bridge.
New wetland featuring shared walkway boardwalk.
1km of walking path.
Connect new stormwater system into existing infrastructure


 

Project Name:

Client:

Value:

Description:

Murray Street Upgrade Stages 4 & 5

Town of Gawler

$1.3 million

Removal and replace 1150m² of existing footpaths and driveways.
Footpaths consists of reinforced honed concrete squares with paver boarders. Installation of new stormwater system across Murray St to existing drainage.


 

Project Name:

Client:

Value:

Description:

Chippendale Pump Station

City of West Torrens

$1.35 million

Supply, installation of pump station.
Supply and installation of gross pollutant trap.
Supply and installation of associated stormwater and pits.
Supply and installation of Secant Piling Wall.


 

Project Name:

Client:

Value:

Description:

Roebuck Street Road Reconstruction

City of West Torrens

$790,000.00

Construction of road works and drainage connections and includes:
• setting out the works from established bench marks and boundaries,
• removal of existing road material, excess soil and all rubbish,
• stormwater drainage installation and connections,
• sub-grade preparation, road sub-base and base course construction
• kerb and gutter and kerbing replacement
• asphaltic concrete (hot mix) wearing course, matching to constructed kerbs and hot mix pavement,
• protection of water mains and associated works
• as constructed survey and drawing of road and drainage works.


 

 

Project Name:

Client:

Value:

Description:

Kerb and Gutter Replacement Programme 2013-2016

City of West Torrens

$3.7 million

Excavation, removal and disposal of existing kerb and gutter.
Pouring and finishing of kerb, gutter, spoon drain, and footpath.
Supply and install kerb adaptors. Reconnection of existing stormwater.


 

Project Name:

Client:

Value:

Description:

Farman Avenue Hendon Road Reconstruction

City of Charles Sturt

$720,000.00

Liaison and cooperation with the Superintendent, the Principal and service authorities. Notification and liaison with residents adjoining the site.
Location and identification of underground and overhead services. Protect services during construction.

• Setting out the works from established benchmarks and boundaries.
• Provision of all traffic management measures.
• Demolition and disposal of existing kerbing and pavement
• Construction of kerbs, pram ramps and other concrete works.
• Full pavement reconstruction
• Disposal of surplus excavated material.
• Provision of as-constructed drawings.


 

Project Name:

Client:

Value:

Description:

Reconstruction/rearrangement of Morphett and Hutchinson Street

District Council of Mt Barker

$1.2 million

Intersection rearrangement comprising kerb and gutter, asphalt and block paved roads, stormwater and public lighting.


 

Project Name:

Client:

Value:

Description:

Dam Construction

Trinity College – Gawler

$240,000.00

Fill existing dams. Construct new dams and associated stormwater works. Pump Station installation.


 

Project Name:

Client:

Value:

Description:

South Oval Stormwater

Trinity College – Gawler

$150,000.00

Installation of precast stormwater pipes. Installation of box culverts. Construction of stormwater pits


 

 

Project Name:

Client:

Value:

Description:

Gross Pollutant Trap Installation

City of West Torrens

$175,000.00

Installation of 4no stormwater management and treatment devices in existing intersections.


 

 

Project Name:

Client:

Value:

Description:

Mitcham Foot Bridges

City of Mitcham

$120,000.00

Install and design bridges in Blackwood Hill Reserve Blackwood. A footbridge style crossing with a span of approximately 8 metres is considered suitable to facilitate walking and cyclist traffic in this
Council Reserve